Home
/
Categories
/
Machinery
/
Beverage Processing Machinery
/
Micro Beer Brewing Equipment
Micro Beer Brewing Equipment
FOB Price
Port
qingdao
Lead Time
30-50 days, depends on capacity
China
Main Products : brewery, brewing, fermentation tank
hanhuai road Dezhou, Shandong
Micro Beer Brewing Equipment Details
Brand Name
Zeyu
Model Number
ZY50-ZY5000
Place of Origin
China
Processing Types
Alcohol
Micro Beer Brewing Equipment Introduce

No. Item Quantity Remark
Milling unit
1 Malt mill 1 Double/four roller, with grist hopper, hydrator
Brew house unit
1 Mash  1 Stainless steel
Tank Volume: 100L-5000
  With agitator
2 Lauter 1 Stainless steel
Tank Volume: 100L-5000
  With agitator
3 Kettle/Whirlpool 1 Stainless steel
Volume: 100L-5000
Steam/electric heating
4 Hot water tank   Stainless steel
1 Steam/electric heating
5 Wort Pump 2 Stainless steel                 
6   1 Stainless steel
Hot water pump
7 Heat Exchanger 1 Stainless steel
Double stage/single stage
8 Mashing Pipes Assorted Stainless steel
9 Working platform 1 Stainless steel
Fermentation unit
1 Fermenters Follow customers requirement Stainless steel
Volume: 100L-10000L
Dimple plate cooling jacket
2 Bright beer tanks Stainless steel
Dimple plate cooling jacket
Conical/domed bottom
3 Yeast Tank 1  Stainless steel,
4 Beer Pipes 1 set Sanitary tube, Plastic.
5 Coolant Pipes assorted Stainless steel
6 Insulation Pipes assorted Polyurethane
Cooling unit
1 Ice Liquor Tank Assorted SUS 304 Stainless steel
Double layers, polyurethane
Capacity being confirmed as actual cool requirement
2 Chiller Assembly unit
3 Ice Liquor Pump   Stainless steel
4 Pipes & Valves assorted Stainless steel
CIP unit
1 CIP unit 1 plant 100L -500L
  Stainless steel
  Include alkali, acid, sterilize hot water tank etc.
   
Control unit
1 Control Cabinet 1 Stainless steel
With power control
2   1 PLC control
Touch Screen
Service item
1. Brewery instruction
1) This is the whole brewing plant, filling unit proposal being offered separately
2) We can handle the transportation to destination port
3) The warranty time is 12 months,
4) If customer needs, we can appoint our engineer for the installation.
2. Installation instruction:
1) Electrical parts fit the local power requirement.
2) Ice water tank contains mixed liquid of glycol and water. Chiller being installed outside of the house to avoid any noisy problem. 

Previous : Coconut Milk Extractor Next : 500L Stainless Steel Cooper Beer Equipment
Copyright 2023-2024 - www.ggmachinery.com All Rights Reserved