Home
/
Categories
/
Machinery
/
Metal Processing Machinery Parts
/
Deep Drawing Part
Deep Drawing Part
FOB Price
MOQ
1k pcs / Piece
Port
Shanghai
Lead Time
20 days
China
Main Products : aluminum, aluminum tube, aluminum extrusion, aluminum profile, machining part, deep drawing, stamping, fire pit, heat exchanger part
No.12, east mozhou road,Jiangning district Nanjing, Jiangsu
Deep Drawing Part Details
Place of Origin
China
Deep Drawing Part Introduce

1. Material
No. Material Description
1.1 Iron/steel like 20g/Q235A/Q235B/15CrMog/15CrMoR,stainless steel,Aluminum alloy,Copper,etc.
2. Product size and tolerance
No. Specification Size Tolerance
2.1 Length/Width/Outer Diameter (mm) ≤500, or customized Max ±1 or custom
2.2 Wall Thickness (mm) 0.5 to 10, or customized Max ±0.4 or custom
2.4 Height (mm) ≤500 or customized Max ±1.5 or custom
2.5 Inner chamfer radius (mm) Min 3-4 Max ±1 or custom
2.6 Outer chamfer radius (mm) Min 8 Max ±1.5 or custom
3. Surface finish and other properties
No. Item Description
3.1 Surface finish The surface  shall be smooth,clean and free from any contamination that cannot be readily removed by cleaning agents normally used in manufacturing
3.2 Surface roughness (Ra) As per customer's requirements
3.3 Manufacturing Process Brief Material preparation→Deep drawing →Reshaping→Surface treatment
4. Packing,Shipping and others
No. Item Description
4.1 Packing To be packed in wooden crate with protection film
4.2 Marking Each box to be legibly marked with the name of the manufacturer or supplier, the designation of material,condition,dimensions and weight
4.3 Shipping tools Ship goods by van to departune port then by sea to desitination port
5.Quality management and spot management
No. Item Description
5.1 Quality control 1. Quality assurance
a. Incoming material quality assurance; b. Process quality assurance; c. First sample quality assurance; d. Final quality assurance.
2. Process management-The right results are from the right process
a. Production process card control; b. Standard operational procedure;c.Job certification;d. Quality chart monitor.
3. Equipment and facility management
a. Periodic maintenance; b.Preventative maintenance.
4. Mold management
a. Mold life management; b.Periodic and preventative maintenance; c. Periodic inspection.
5.2 Inspection Tools Altimeter,Vernier caliper,Micrometer,3D coordinate measuring instrument
5.3 Spot management "5S" management (sort,set in order,shine,standard,sustainable).

Previous : Machining Parts Next : Automatic Drainer
Copyright 2023-2024 - www.ggmachinery.com All Rights Reserved