Chemical Foaming Cable Extrusion Production Line
Application:
Apply to high frequency cable,communication cable,date cable,coaxial cable,Rf cable,RG,JIS etc core wire double layer chemical foam or solid core wire extrusion.
common machine model:
A:TZ-30+22 Double layer chemical foaming simultaneous extrusion line
B:TZ-40+30 Double layer chemical foaming simultaneous extrusion line
C:TZ-50+35 Double layer chemical foaming simultaneous extrusion line
D:TZ-25+40+25 Triple layer chemical foaming simultaneous extrusion line
Remarks:
Supply-side required dates and docunments(a&b provide within 7 working days after signed the contract,others attcheh when delivery)
a.full set of equipment installation layout.
b.Water, electricity and gas supply requirements and the amount of interface.
Equipment consumables and wearing parts lists, grades and their origin, vulnerable parts of the provision of spare parts map.
Control components and electrical specifications, models list, Converter Manual.
Electrical schematics, product manual, the ultimate test books, machine operation and maintenance manuals.
Packing List:
Supply-side should provide the service as below: (after deliveryed the machine)
To arrange assistance for installation, adjustment and operating test.
technician arranged to be guided by supplier when operating the machine
demand-side should providing facilities and the preparation projects as below: (After deliveryed the machine)
power source,water source,compressed-air line and related project
not listed connector device.
Needed materials for product testing
Application:
Apply to high frequency cable,communication cable,date cable,coaxial cable,Rf cable,RG,JIS etc core wire double layer chemical foam or solid core wire extrusion.
common machine model
A:TZ-30+22 Double layer chemical foaming simultaneous extrusion line
B:TZ-40+30 Double layer chemical foaming simultaneous extrusion line
C:TZ-50+35 Double layer chemical foaming simultaneous extrusion line
D:TZ-25+40+25 Triple layer chemical foaming simultaneous extrusion line
Remarks
Supply-side required dates and docunments(a&b provide within 7 working days after signed the contract,others attcheh when delivery)
a.full set of equipment installation layout.
b.Water, electricity and gas supply requirements and the amount of interface.
Equipment consumables and wearing parts lists, grades and their origin, vulnerable parts of the provision of spare parts map.
Control components and electrical specifications, models list, Converter Manual.
Electrical schematics, product manual, the ultimate test books, machine operation and maintenance manuals.
Packing List.
Supply-side should provide the service as below: (after deliveryed the machine)
To arrange assistance for installation, adjustment and operating test.
technician arranged to be guided by supplier when operating the machine
demand-side should providing facilities and the preparation projects as below: (After deliveryed the machine)
power source,water source,compressed-air line and related project
not listed connector device.
Needed materials for product testing
More informations please send us inquiry for details