Home
/
Categories
/
Machinery
/
Mining Machinery Parts
/
Bogie Bowl Wear Liner
Bogie Bowl Wear Liner
FOB Price USD 50 USD / Piece
MOQ
100 pcs / Piece
Port
Shanghai
Lead Time
20 days
China
Main Products : aluminum, aluminum tube, aluminum extrusion, aluminum profile, machining part, deep drawing, stamping, fire pit, heat exchanger part
No.12, east mozhou road,Jiangning district Nanjing, Jiangsu
Bogie Bowl Wear Liner Details
Place of Origin
China
Bogie Bowl Wear Liner Introduce

1. Material
No. Material
1.1 High manganese steel like ZGMn13,stainless steel,aluminum,or custom
2. Product size and tolerance
No. Specification Size Tolerance
2.1 Outer Diameter (mm) ≤500, or customized ±1.5, or as per drawing
2.2 Inner Diameter (mm) ≤450, or customized ±1.5, or as per drawing
2.3 Wall Thickness (mm) 6 to 6.4, or customized ±0.3, or as per drawing
2.4 Height (mm) ≤450 or customized Max ±1.5, or as per drawing
2.5 Inner chamfer radius (mm) ≥2 ±1, or as per drawing
2.6 Outer chamfer radius (mm) ≥4 ±1, or as per drawing
3. Chemical composition for materials
No. Number Chemical Composition (%)
C Si Mn P S Fe
3.1 Mn13 0.90-1.20 0.30-0.80 11.00-14.00 ≤0.035  
≤0.030 
85.0-88.0
4. Mechanical properties
No. Number Yield Strength
(Mpa)
Tensile Strength
(Mpa)
Elongation
(%)
Initial Hardness
(HB)
Hardness after Hardening (HB) Impact at 20โ„ƒ
(J)
4.1 Mn13 ≥400 ≥800 ≥40% ≥200 ≥400 ≥90
5. Surface finish and other properties
No. Item Description
5.1 Surface finish The surface  shall be smooth,clean and free from any contamination that cannot be readily removed by cleaning agents normally used in manufacturing
5.2 Surface roughness (Ra) from 30um to 3.2um depending on detailed requirement
5.3 Manufacturing Process Brief Material preparation→Deep drawing (or spinning)→Reshaping→Surface treatment
5.4 Raw material source TAIYUAN IRON & STEEL (GROUP) CO.,LTD. Or  Baosteel Group Corporation,etc. 
6. Packing,Shipping and others
No. Item Description
6.1 Packing To be packed in wooden crate
6.2 Marking Each box to be legibly marked with the name of the manufacturer or supplier, the designation of material,condition,dimensions and weight
6.3 Shipping tools Ship goods by van to departune port then by sea to desitination port
7.Quality management and spot management
No. Item Description
7.1 Quality control 1. Quality assurance
a. Incoming material quality assurance; b. Process quality assurance; c. First sample quality assurance; d. Final quality assurance.
2. Process management-The right results are from the right process
a. Production process card control; b. Standard operational procedure;c.Job certification;d. Quality chart monitor.
3. Equipment and facility management
a. Periodic maintenance; b.Preventative maintenance.
4. Mold management
a. Mold life management; b.Periodic and preventative maintenance; c. Periodic inspection.
7.2 Inspection Tools Altimeter,Vernier caliper,Micrometer,3D coordinate measuring instrument
7.3 Spot management "5S" management (sort,set in order,shine,standard,sustainable).

Previous : Slag Pot Next : MONDE Excavator Crusher Bucket
Copyright 2023-2024 - www.ggmachinery.com All Rights Reserved